Care Center Update – May 22, 2017

On the interior, the millwork continues.  The radius windows have been installed under the barrel roof and sheetrock is finishing around them.  Ceilings and lift systems continue to be installed along with lighting. On the exterior, the walk under and drive under canopy structure are nearly complete.  Awnings are installed.    


Shake-a-Leg 5k

The hospital sponsored 5k is the Saturday of Timber Days. Date: June 10, 2017 Place: Doug Johnson Recreation Center Time: 8:00 a.m. Registration/9:00 a.m. Race Begins Registration


Care Center Update – May 3, 2017

Wall and ceiling finishes continue.  Millwork has arrived and is currently being installed.  The steel was delivered for the walk under canopy and the drive under canopy.  The walk under is currently being erected and drive under will follow.    


Care Center Update – April 18, 2017

The sheetrock is nearing completion.  The north 14 rooms have paint on the walls and ceiling grid installed. Our first cabinets are scheduled for delivery on Monday 4/24.  


Care Center Update – March 29, 2017

Exterior – Crane was on site last week to set roof top units and cooling units.  Site work will resume when conditions of the soil allow.  Interior – Rough-ins continue ahead of the drywall.  The resident room lift supports are being installed.  Twelve of the resident rooms are being taped and sanded with painting scheduled to…


Care Center Update – March 21, 2017

The exterior finishes are nearing completion.  On the interior sheetrock continues on the north resident rooms. Painting starting next week with ceiling grid following.    


Care Center Update – February 2, 2017

Interior steel stud framing continues along with the mechanical and electrical rough-ins.  Drywall to start in a couple weeks.  All the exterior windows have been installed in resident rooms.  


Care Center Update – January 4, 2017

Interior wall layout to begin next week.  


Care Center Update – December 29, 2016

Windows are in the process of being installed on the north wall.  The pouring of the floor has started and will continue into next week.  Next week the interior wall layout will begin.    


Care Center Update – December 21, 2016

Scaffolding has been set and enclosed on the NE corner in preparation of brick. Roofing has started with 2/3’s of the insulation and roofing laid out.  Expected to be water tight by the end of the week.  Anticipation of the interior floor being poured next week.