Parents, do you want to enjoy your kids, have fun with them, and experience less stress in your family? Parenting the Love and Logic way will teach parents of preschoolers through teenagers how to: Use humor, hope, and empathy to build up the parent/child relationship Avoid un-winnable power struggles and arguments, exhausting battles over morning…


Care Center Update – July 17, 2017

Most of the curb and sidewalk on the north side has been completed.  Sidewalk work will continue on the east and south sides.  On the interior finishes continue on walls, floors, ceilings and fixtures.    


Care Center Update – June 19, 2017

The exterior site work is progressing, the sign base and stoops were poured last week. The walk under and drive under canopies structures are complete and ready for roofing and paint. The standing seam roofing on the barrel roofs has started and should be complete sometime this week. The interior finishes are on the move with…


Care Center Update – May 22, 2017

On the interior, the millwork continues.  The radius windows have been installed under the barrel roof and sheetrock is finishing around them.  Ceilings and lift systems continue to be installed along with lighting. On the exterior, the walk under and drive under canopy structure are nearly complete.  Awnings are installed.    


Care Center Update – May 3, 2017

Wall and ceiling finishes continue.  Millwork has arrived and is currently being installed.  The steel was delivered for the walk under canopy and the drive under canopy.  The walk under is currently being erected and drive under will follow.    


Care Center Update – April 18, 2017

The sheetrock is nearing completion.  The north 14 rooms have paint on the walls and ceiling grid installed. Our first cabinets are scheduled for delivery on Monday 4/24.  


Care Center Update – March 29, 2017

Exterior – Crane was on site last week to set roof top units and cooling units.  Site work will resume when conditions of the soil allow.  Interior – Rough-ins continue ahead of the drywall.  The resident room lift supports are being installed.  Twelve of the resident rooms are being taped and sanded with painting scheduled to…


Care Center Update – March 21, 2017

The exterior finishes are nearing completion.  On the interior sheetrock continues on the north resident rooms. Painting starting next week with ceiling grid following.    


Care Center Update – February 2, 2017

Interior steel stud framing continues along with the mechanical and electrical rough-ins.  Drywall to start in a couple weeks.  All the exterior windows have been installed in resident rooms.  


Care Center Update – January 4, 2017

Interior wall layout to begin next week.