Care Center Update – May 22, 2017

On the interior, the millwork continues.  The radius windows have been installed under the barrel roof and sheetrock is finishing around them.  Ceilings and lift systems continue to be installed along with lighting. On the exterior, the walk under and drive under canopy structure are nearly complete.  Awnings are installed.    


Care Center Update – May 3, 2017

Wall and ceiling finishes continue.  Millwork has arrived and is currently being installed.  The steel was delivered for the walk under canopy and the drive under canopy.  The walk under is currently being erected and drive under will follow.